Steel Bridge Competition

2012 Columbia Team, Paper to Final design. Loads Modeled in SAP2000, Drafted in AutoCAD

Conceptual Sketches

Trusses were going to be utilized from the very beginning.

Load Analysis

SAP2000 was used to optimize the structural integrity

Bridge Dimensions in AutoCAD

Profile, top, and front views of the bridge.

Collaboration

The only way we were able to complete the project was with a team of diverse people. Working in groups I find myself able to augment my strengths and at the same time energize those around me.